top of page
FOSS MARINE
2022
Project Description:
Project Scope:
Year Awarded:
Client:
New Bedford, MA
Location:
Environmental Partners - An Apex Company
New Bedford Foss Marine Terminal is located on the New Bedford harbor. Their focus is on providing transport, installation, operations and maintenance services for the U.S. Offshore Wind Industry. This project was focused on power/service provider electrical services and infrastructure to 4 new single-story buildings, pier shore, guard house, fuel pumping station, dock master building, site lighting system, and existing foundry building
ESE designed and engineered electrical services to buildings onsite as well as the exterior site as a whole. Exterior site electrical systems provided include primary conduits, proposed transformation, secondary conduits and conductors, telephone/CATV and municipal fire alarm system services. Building electrical systems included power distribution, lighting (normal, emergency/egress, and controls), and telephone/data/voice empty conduit systems. ESE also provided a “shore power” distribution system and a “common area” power distribution system for the site lighting the dock master building and the guard shack. Temporary site power systems were engineered and provided during construction phases.
bottom of page